PR: Activation Milestone (M2) - Essentials & Best Practices

Maurizio - PLR Product Ops avatar
Written by Maurizio - PLR Product Ops
Updated over 2 weeks ago

This article highlights the essentials for completing the activation (M2) milestone. It covers the key approvals, required documentation, and monitoring setup so the system is ready without delays.

Main Asks at M2:

  • System turned on, communicating, operating as normal without any errors.

  • See examples of OEM monitoring graphs for reference HERE

  • Ensure system is producing with tolerance of production estimate

  • Conditional Approval Items - anything stipulated from M1

  • Additional site improvement work photos (tree removal, MPU)

  • Always ensure commissioning settings are configured correctly:

    • Take screenshots of all commissioning pages during installation

    • Confirm normal status/active communication for each device

    • Normal consumption/production data with cellular signal

    • Ensure monitoring guides are followed per manufacturer and with the help of Palmetto Monitoring Guidance

    • Consumption CT settings properly configured based on system setup on site/manufacturer

    • PCS Settings properly configured, when necessary


Activation Milestone (M2) - Monitoring Best Practices

  • Micros and all devices must have a normal operating status and data

  • Alerts section of the portal must be clear with no active errors

  • Notable difference in the PR Mainline Program:

    • All Monitoring Access is required at M1