Skip to main content

DOE: Change Orders

Parameters & Thresholds

This section details various scenarios that may require a change order, and the business rules associated with those scenarios. Please note the differences between a PPA and a Lease on Production and System size change orders.

Change Type

Definition

Business Rule

Notes

Production

Change in modeled production. Often occurs as a result of onsite installation changes

Click to view

PPA:

  • If production (kWh) is within above (-5 to +20%) NO customer change required

Lease:

  • If production (kWh) is within above (-5 to +20%) NO customer change required

  • If system size (kW) is within (-5 to +20%) no customer change required.

Click to view

LR Portal update still required even if a customer change is not. Changes must be reflected in Install Milestone submission. Note that PPA and Lease are treated differently.

System Size

Change in physical system size, increase or decrease in module count

Click to view

All kW system size changes require a new contract to be signed.

Click to view

LR Portal update still required even if a customer change is not. Changes must be reflected in Install Milestone submission. Note that PPA and Lease are treated differently.

Solar-Ready Repairs (SRRs)

Change to the SRR amount post contract signature

No Signature Required

Click to view

The SRR amount entered during the M1 Install Package submission must serve as our source of truth and accurately reflect the current state of the installation.

Module Brand

Change in manufacturer, usually for supply chain efficiency

No Signature Required

Click to view

No signature as long as on AVL & wattage change doesn't exceed -5/+10 thresholds

Customer Name / Add or Remove Customer

Addition or subtraction of co-borrower, or customer name based on utility account holder

Signature Required

Click to view

Signature required as project will need to pass through underwriting again. Note coborrowers not applicable as of Oct. 2023.

Address

Signature Required

Click to view

Project will pass through underwriting again.

Utility

Install & Activation Package documents must match contracted utility.

Signature Required

Click to view

Rates may vary from one utility to another.

Year 1 Monthly Payment

Click to view

Not applicable if change meets production thresholds

Year 1 Solar Rate

Signature Required

Click to view

May apply as rates shift over time

Escalator

Signature Required

Down payment

Signature Required

Click to view

Not applicable for MVP

Rebate

Change in rebate value, may occur as incentive programs step down

No Signature Required

Click to view

Client signature not required as LR takes incentive

Offset

No Signature needed

Click to view

Not applicable in LR contract

Inverter

No Signature needed

Click to view

Signature not needed if the inverter is on AVL and the size does not change

Steps to Complete a Change Order

Follow the below steps to complete a change order within the LR portal, and execute new contracts. The high level steps are below. Note that:

  • LightReach support can provide guidance on change orders. However...

  • LightReach support cannot manipulate pricing changes or execute price-related change orders on the Installer behalf. Sensitive information such as quote selection is the responsibility of the Installer.

First, void the initial contract (if applicable). Then, proceed to void the current quote. For address updates specifically, ensure that the correct property address is assigned and reissue any affected contracts.

Then, proceed to create a new quote, select & save. The new contract can now be sent.

Important things to note

  • Once a contract is sent, pricing, adders and PPW to the EPC are locked in.

  • Changes to system size, and any resulting pricing changes, will not go into effect unless a change order (new contract) is executed.

  • Pricing displayed during change orders aligns with real-time market and utility rates, reflecting dynamic pricing mechanisms.

  • Switching utilities can necessitate a new quote due to the utility-specific nature of pricing structures.

Did this answer your question?